Sydney Opera House

This project was completed in August 2013 for John Holland Group.Opera House SafetyOpera House
The safety nets were manufactured at our warehouse  for the TTB Shaft on the VAPS project at the Opera House with David present at installation.

The certified safety net was a 60mm x 60mm x 5mm UV treated knotless polypropylene mesh with a red debris mesh overlay.